Completed Case Studies

Hildon Water Ltd
Commercial Hot Water Installation



Upgrading the hot water system from an existing Vaillant combination boiler which was supplying multiple outlets throughout the Hildon water bottling factory.
 
  • Install a Vaillant unvented calorifier
  • zone the heating and hot water
  • Install an hot water secondary return througout the factory to ensure instant hot water at the required setpoint temperatures
  • Grundfos secondary return pump with full time control
  • Now supplying infared taps in the factory for hygiene purposes
Case Study 2
Mudeford
Commercial plant room




Complete plant room comprising of the following equipment:
  • 2 Vaillant ecotec light commercial condensing boilers
  • Vaillant low loss header
  • Esbe full weather compensation controlled from a satchwell DC1100 controller with a complete building management system which has been integrated into an Adapt home automation system
  • Altechnic matrix pressurisation unit
  • Dutypoint booster set and break tank
  • 2 Heatrae Sadia 300ltr unvented domestic hot water cylinders
  • Grundfos pumps throughout
  • Calorex pool equipment and heat exchanger
  • Crane DRV valves
Case Study 3
The Arrow Pub, Southampton
Boiler room refurbishment



Removal of the existing floor standing boiler and leaking hot water cylinder and the removal of all steel pipework.

Replacement specification:
  • Vaillant ecotec light commercial condensing boiler
  • Insulated plate heat exchanger
  • Domestic hot water cylinder with secondary return
  • Grundfos pumps
  • Horstmann controls
Case Study 4
Various Bathroom Refurbishments
Southampton and London


Case Study 5
Complete Residential Refurbishment, Southampton
Underfloor Heating
installation

Case Study 6
Public House, Romsey
Commercial LPG Bulk Storage Vessel Gas Safety Inspection & Testing


Case Study 7
Solar Installation, Romsey



Complete Vaillant solar thermal installation comprising of 4 evacuated tube panels and a 310ltr solar cylinder with a full vaillant control system.
Case Study 8
Residential, Bournemouth
Hot Water Installation